BIM 360 Glue: File Transmission Legal Requirements
Modified on: Wed, Aug 19 2015 4:59 PMBIM 360 Glue: File Transmission Legal Requirements
Champion
and Pursuit Team
Steps
Involved:
STEP 1: Collect all designer file transmission / BIM disclaimer forms
STEP 2: Modify the Swinerton disclaimer form specific for each subcontractor and consultant who will be utilizing the 360 Glue site
STEP 3: Send all disclaimer forms to each subcontractor for signature and return
Why
this step is important:
1. This will protect Swinerton and our Clients from unnescessary risk from subcontractors utilizing the files to estimate, fabricate and install from
1. Collect the required sign offs as early as possible so that file transmissions can take place as needed
1. Send or give access to electronic CAD or BIM information for any subcontractor prior to receiving their returned, executed disclaimer forms.